CMT

Installation method and precautions for threaded straight joints

HomeIndustry Knowledge ✦ Installation method and precautions for threaded straight joints

Installation method and precautions for threaded straight joints

Threaded straight joint is a kind of pipe fitting, which plays the role of connection, turning and diversion in the pipeline system. Many people ask about its installation method. Its installation method is very simple, but there are many precautions to pay attention to during the installation process. Next, the editor will introduce its installation method and precautions.

Installation method:
1. Preparation: Before installing the joint, check whether the pipe mouth is clean and undamaged. If there is welding slag, dust and other debris, it needs to be cleaned up to avoid affecting the connection quality.

2. Install the joint: At the location where the pipe is connected, align the joint with the pipe and tighten it. Use tools to reinforce the sealing gasket to ensure that the connection is tight and leak-free.

3. Confirm the joint position: After installing the threaded straight-through joint, you need to use a ruler to check whether the joint position is in the center to ensure that the pipeline is unobstructed.

4. Water pressure test: After the installation is completed, a test is required. After the pipe is filled with water, a water pressure test is performed to ensure that there is no leakage in the pipe and to ensure the overall quality of the pipe.

Installation Notes:
1. Choose the right joint: When choosing a joint, you must make a reasonable choice based on factors such as the diameter, wall thickness and pressure of the pipe to avoid water leakage or other safety hazards.

2. Check the quality of the threaded straight connector: When purchasing a threaded straight connector, you must check its quality. Choose a threaded straight connector with good quality and solid material to ensure that there will be no problems during use.

3. Confirm the tightness of the joint: When installing the joint, you must ensure that the joint and the pipe are well aligned and the tightness is moderate. It should not be too tight or too loose, otherwise it may cause dangerous situations such as pipe rupture or leakage.

4. Pipeline overall pressure test: After installing the joint, a pressure test must be carried out. This can promptly detect problems in the pipeline and prevent possible water leakage or other dangerous situations.

The installation of threaded straight-through joints requires us to be very cautious in selection, installation, pressure testing, etc. We must strictly follow the installation steps to ensure the installation quality and the overall quality of the pipeline to avoid danger and loss to our work and production. As long as the precautions are taken, the installation of the joint will be very simple, convenient and fast, bringing double benefits to the pipeline system.
Scroll to Top